Product Details:
|
Keywords: | PCB Milling Depaneling Machine | Sub-board Work Range: | 300mmx350mm |
---|---|---|---|
XYZ Drive Mode: | AC Servo Motor | Number Of Motion Axes: | 7 Axes |
Program Teaching Method: | Color CCD Image Intuitive Teaching Input | Operation Interface: | Windows 7 Interface |
Upper Vacuum Power: | 2HP | Cutting Spindle Sycotec (Germany): | MAX80000rpm (automatic Tool Change) |
X-Y AC Servo Speed: | 0-1000mm/sec | Z AC Servo Speed: | 0-800mm/sec |
X-Y Repeatability: | ±0.01mm | Cutting Accuracy: | ±0.02mm |
EXE-880AT Milling Cutter Depaneling Machine Above Vacuuming
EXE-880AT Milling Cutter Depaneling Machine Above Vacuuming Parameters:
Sub-board work range | 300mmx350mm | Main engine and dust collector voltage | 220V 1φ and 3φ |
XYZ drive mode | AC servo motor | power consumption | 3.5KVA |
Number of motion axes | 7 axes | Static Elimination Gun | |
program teaching method | Color CCD image intuitive teaching input | visual system | High-resolution digital camera |
Operation interface | Windows 7 interface | drive motor | AC brushless servo motor |
Upper vacuum power | 2HP | Mechanical pick and place arm | Anti-static vacuum nozzle |
Cutting Spindle Sycotec (Germany) | MAX80000rpm (automatic tool change) | Feeding method | rail transport |
X-Y AC Servo Speed | 0-1000mm/sec | Outlet method | Belt conveying or carrier output or rail conveying |
Z AC Servo speed | 0-800mm/sec | transfer method | Vacuum suction nozzle adsorption transfer |
X-Y repeatability | ±0.01mm | flow direction | left→right |
Cutting accuracy | ±0.02mm | program backup | USB interface |
CCD camera calibration accuracy | ±0.01mm | control method | Dedicated controller |
Split plate stress value | Below 300uε | Dust cabinet size | 640mm×785mm×1760mm(D×W×H) |
Tool diameter | 0.8-2.3mm | Machine size | 2014mm×1230mm×1650mm(D×W×H) |
PCB board cutting thickness | 0.2mm-6.0mm | Host + dust collector weight | 1000KG |
Features Of Vacuum Cleaner EXE-880AT On Milling Cutter Type Online Splitter:
Upper vacuum system:
1. The upper vacuum system uses a vacuum pump to absorb the dust particles generated during cutting.
2. The air inlet is located on the main shaft.
3. During the cutting process, the dust is brought up by the high-speed rotating milling cutter and sucked away by the vacuum tube. See Attachment.
advantage:
1. Can work well on products with both tall and short components.
2. No air leakage
3. Adopt a high-power vacuum pump.
4. Very little dust will fall into the gap between components and PCB, which greatly reduces the probability of a PCBA short circuit.
Automatic tool change:
1. Save time, realize automation, reduce human factors, high precision and strong stability.
Quality Assurance And After-sales Service:
1. The overall equipment warranty period is one year. If there are quality problems, after-sales maintenance and replacement are provided free of charge.
2. The after-sales service personnel are all senior professional and technical personnel of the company. After the company's formal training, they can work alone after passing the examination.
3. After the after-sales department receives the notification of equipment failure, if the equipment fails to work normally, it will reply within half an hour within the Pearl River Delta, and dispatch personnel to the scene to solve the problem within 2 hours; reply within half an hour outside the Pearl River Delta, and then According to the specific situation, dispatch after-sales personnel to the scene to solve the problem within 24 hours. (If the startup cannot be produced normally, the after-sales personnel communicate with the customer and arrive at the scene within the time required by the customer).
4. The company's after-sales personnel are on standby 24 hours a day, regardless of Saturdays, Sundays and holidays.
5. After the equipment arrives at your company, our company arranges engineering and technical personnel to install and debug it.
6. Our company can arrange after-sales technicians to stay in the customer's company for three days, responsible for training and technical guidance (the time can be extended according to the customer's appropriate requirements) until they are accepted.
7. Our company's after-sales technicians are responsible for comprehensive training. Your company's operators and technicians will serve the installation and operation of our company's equipment wholeheartedly without reservation.
8. Under the premise of the customer company's request, our company can help the customer company to carry out the operation and debugging test of the sub-board machine for its technical personnel.
Contact Person: exe
Tel: +8615818201987