Product Details:
|
Keywords: | Milling Cutter Depaneling Machine Above Vacuuming | Single Side Working Size: | 290mm X 350mm |
---|---|---|---|
Dual Workbenches With The Same Input And Output: | 580mm X 350mm | X-Y AC Servo Speed: | 0-1000mm/sec |
Z AC Servo Speed: | 0-800mm/sec | X-Y Repeatability: | ±0.01mm |
Cutting Accuracy: | ±0.02mm | CCD Camera Calibration Accuracy: | ±0.01mm |
Split Plate Stress Value: | Below 300uε | NSK Spindle Speed: | Max.60,000rpm |
Tool Diameter: | 0.8-2.3mm | Dust Collector Power: | 2HP (upper Vacuum) |
EXE-880 Milling Cutter Depaneling Machine Above Vacuuming
EXE-880 Milling Cutter Depaneling Machine Above Vacuuming Parameters:
keywords | Vacuuming On The Milling Cutter Splitter | Split plate stress value | Below 300uε |
Single side working size | 290mm X 350mm | NSK spindle speed | Max.60,000rpm |
Dual workbenches with the same input and output | 580mm X 350mm | Tool diameter | 0.8-2.3mm |
X-Y AC Servo Speed | 0-1000mm/sec | PCB board cutting thickness | 0.2mm-6.0mm |
Z AC Servo speed | 0-800mm/sec | Dust collector power | 2HP (upper vacuum) |
X-Y repeatability | ±0.01mm | Dust cabinet size | 640mm×785mm×1760mm(D×W×H) |
Cutting accuracy | ±0.02mm | Machine size | 1075mm×1430mm×1460mm(D×W×H) |
CCD camera calibration accuracy | ±0.01mm | Host + dust collector weight | 800KG |
Introduction To Equipment Configuration:
1.: double worktable structure
1. The milling cutter type online splitter uses double slide rails and cylinders to run on two platforms. It can cut different types of products at the same time, greatly reducing the waiting time for picking and placing plates, and at the same time, the double platform can be changed to a large single platform. Increase the working size and greatly improve the flexibility of the equipment.
2: Upper vacuum spindle structure
1. The high-speed imported spindle is used to cut the sub-board, which greatly reduces the cutting stress, with high precision, small inertia and fast response.
2. The milling cutter detection system monitors the milling cutter status in real-time and effectively prevents the cutter from continuing to run after the cutter is broken.
3. The new visual system, uniform ring light source, with brightness adjustment function, makes various types of Mark points better identify, and adapt to such as tin-plated, copper-plated, gold-plated, tin-sprayed, and various types of PCBs with different colors. The whole system is equipped with a vision Alignment compensation function.
3: upper vacuuming method structure
4: CNC dedicated controller
1. The independent CNC dedicated controller integrates the control part, with strong loop control stability, high precision, fast response and transmission, and strong anti-interference.
5: Dust collector
1. High-efficiency motor and fan blades are used, with large suction, built-in polyester needle-punched felt dust bag with large void ratio, good air permeability, strong oxidation resistance, and noise can be controlled within 80 decibels.
Quality Assurance And After-sales services:
1. The overall equipment warranty period is one year. If there are quality problems, after-sales maintenance and replacement will be provided free of charge.
2. The after-sales service personnel are all senior professional and technical personnel of the company. After the company's formal training, they can work alone after passing the examination.
3. After the after-sales department receives the notification of equipment failure, if the equipment fails to work normally, it will reply within half an hour within the Pearl River Delta, and dispatch personnel to the scene to solve the problem within 2 hours; reply within half an hour outside the Pearl River Delta, and then According to the specific situation, dispatch after-sales personnel to the scene to solve the problem within 24 hours. (If the startup cannot be produced normally, the after-sales personnel communicate with the customer and arrive at the scene within the time required by the customer).
4. The company's after-sales personnel are on standby 24 hours a day, regardless of Saturdays, Sundays and holidays.
5. After the equipment arrives at your company, our company arranges engineering and technical personnel to install and debug it.
6. Our company can arrange after-sales technicians to stay in the customer's company for three days, responsible for training and technical guidance (the time can be extended according to the customer's appropriate requirements) until they are accepted.
7. Our company's after-sales technicians are responsible for comprehensive training. Your company's operators and technicians will serve the installation and operation of our company's equipment wholeheartedly without reservation.
8. Under the premise of the customer company's request, our company can help the customer company to carry out the operation and debugging test of the sub-board machine for its technical personnel.
Contact Person: exe
Tel: +8615818201987