Product Details:
|
Keywords: | Online Automatic Depaneling Machine | Sub-board Work Range: | 180mmx180mm |
---|---|---|---|
Xyz Drive Mode: | Ac Servo Motor | Ac Servo Motor: | 7 Axes |
Program Teaching Method: | Color Ccd Video Intuitive Teaching Input | Operation Interface: | Win7 Window Interface |
Upper Vacuum Power: | 2hp | Lower Dust Collector Power: | 3hp (option 5hp) |
Cutting Spindle Sycotec (Germany): | Max80000rpm (automatic Tool Change) | X-y Ac Servo Speed: | 0-1000mm/sec |
Z Ac Servo Speed: | 0-800mm/sec | X-y Repeatability: | ±0.01mm |
Cutting Accuracy: | ±0.02mm | Ccd Camera Calibration Accuracy: | ±0.01mm |
Miniaturized Online Automatic Depaneling Machine EXE-180M
Online Automatic Depaneling Machine Parameters:
keywords | Online Automatic Splitter | PCB board cutting thickness | 0.2mm-6.0mm |
Sub-board work range | 180mmx180mm | Main engine and dust collector voltage | 220v 1φ and 3φ |
XYZ drive mode | ac servo motor | power consumption | 3.5kva |
Number of motion axes | 7 axes | Static Elimination Gun | |
program teaching method | Color CCD video intuitive teaching input | visual system | High-resolution digital camera |
Operation interface | win7 window interface | drive motor | AC brushless servo motor |
Upper vacuum power | 2hp | Mechanical pick and place arm | Anti-static vacuum nozzle |
Lower dust collector power | 3hp (option 5hp) | Feeding method | rail transport |
Cutting spindle sycotec (Germany) | max80000rpm (automatic tool change) | Outlet method | Belt conveying or carrier output or rail conveying |
x-y ac servo speed | 0-1000mm/sec | transfer method | Vacuum suction nozzle adsorption transfer |
z ac servo speed | 0-800mm/sec | flow direction | left→right |
x-y repeatability | ±0.01mm | program backup | USB interface |
Cutting accuracy | ±0.02mm | control method | Dedicated controller |
CCD camera calibration accuracy | ±0.01mm | Dust cabinet size | 640mm×785mm×1760mm(d×w×h) |
Split plate stress value | Below 300uε | Machine size | 1340mm×800mm×1528mm(D×W×H) |
Tool diameter | 0.8-2.3mm | Host + dust collector weight | 1000kg |
Introduction to the equipment configuration of the miniaturized online automatic depaneling machine EXE-180M:
(1): Clamp-type plate-taking structure
1. Place the product sub-board jig on the processing platform sub-board. After the processing is completed, the sub-board jig is clamped and placed on the track to flow into the lower process.
(2): The special product sub-board jig enters the track mode
(3): Special product sub-board jig rail discharge
1. After the product is cut, the reclaiming gripper clamps the entire product jig and places it on the discharge track to transport it to the next production process.
(4): Automatic tool change mode
1. The miniaturized online splitter adopts an automatic tool-changing spindle imported from Germany. It saves time, realizes automation, reduces human factors, has high precision and strong stability
2. Built-in four sets of milling cutter magazines, which are convenient for automatic replacement of milling cutters and meet the needs of sub-panel processing.
(5): The structure of the vacuum suction cup to take the plate
1. Pick and place device: automatic loading and unloading (modular vacuum suction claw, vacuum device, can be independently controlled)
2. Transmission structure: X2 axis moves Z2, Z3 axis sucks, AC servo motor control.
3. Board taking speed: 0-1000mm/sec (can be set)
(6): Special product belt discharging method
1. The vacuum suction cup take-up shaft sucks the cut product one-time vacuum suction and places it on a special product fixture to transport it to the next production process.
Quality Assurance And After-sales Service:
1. The overall equipment warranty period is one year. If there are quality problems, after-sales maintenance and replacement are provided free of charge.
2. The after-sales service personnel are all senior professional and technical personnel of the company. After the company's formal training, they can work alone after passing the examination.
3. After the after-sales department receives the notification of equipment failure, if the equipment fails to work normally, it will reply within half an hour within the Pearl River Delta, and dispatch personnel to the scene to solve the problem within 2 hours; reply within half an hour outside the Pearl River Delta, and then According to the specific situation, dispatch after-sales personnel to the scene to solve the problem within 24 hours. (If the startup cannot be produced normally, the after-sales personnel communicate with the customer and arrive at the scene within the time required by the customer).
4. The company's after-sales personnel are on standby 24 hours a day, regardless of Saturdays, Sundays and holidays.
5. After the equipment arrives at your company, our company arranges engineering and technical personnel to install and debug it.
6. Our company can arrange after-sales technicians to stay in the customer's company for three days, responsible for training and technical guidance (the time can be extended according to the customer's appropriate requirements) until they are accepted.
7. Our company's after-sales technicians are responsible for comprehensive training. Your company's operators and technicians will serve the installation and operation of our company's equipment wholeheartedly without reservation.
8. Under the premise of the customer company's request, our company can help the customer company to carry out the operation and debugging test of the sub-board machine for its technical personnel.
Contact Person: exe
Tel: +8615818201987