The details of the points that need to be paid attention to in the installation of the depaneling machine
1. The power supply voltage of the distributor is 220V single-phase AC, and the power cord is made of special wires; one end is a 3-pin European standard plug (for power supply), and the other end is a 5-pin aviation plug (inserted into the 5-pin female of the distributor). power port).
2. The power supply voltage of the dust box is 380V three-phase AC, and the power cord is a 4*2.5mm2 cable (red, blue and black are respectively connected to three-phase AC, and the two-color wire is grounded).
3. For the start-stop control signal line of the dust box, the single-ended interface is a 4PIN aviation plug (inserted into the 4PIN female control port of the distributor).
The gas is supplied by a gas pipe with a diameter of φ8. The pressure gauge on the pneumatic triad monitors the inlet pressure in real-time. When the inlet pressure is lower than the set value (4kg/cm2), the station will automatically alarm, indicating that the pressure is low.
Two monkey hoops with a diameter of 150mm, a length of 3m and a 200mm are standard. One end of the suction pipe is connected to the suction port under the distributor, the other end is connected to the air inlet of the dust collecting box, and the two ends are respectively clamped with monkey hoops. The air outlet has just been agreed with the customer to connect to the customer's central vacuum duct with a 200mm air duct.